Bali Zero
  • Home
  • Visa
  • Tax
  • Property
Menu
  • Home
  • Visa
  • Tax
  • Property
Get StartedLogin
Get Started
KBLI Navigator/Section F/42914
KBLI 42914

Hydropower Reservoir Construction

Konstruksi Reservoir Pembangkit Listrik Tenaga Air

🏗️ Section F — Construction

In Bali: open to a PT PMA

✅Open· 100% ForeignMedium-High RiskDirect Match🏝️✅Registrable in Bali· medium conf.

This covers the physical construction of water-control structures for hydroelectric power plants—specifically reservoirs, intake gates, penstocks, and outflow systems—that manage water flow to generate electricity.

What Changed

Direct 1:1 match from KBLI 2020 — code and scope unchanged.

What You Need

In Bali, the island-wide moratorium (in force since 13 May 2026) only halts PMA registrations for Low and Medium-Low risk lines — this KBLI's large-scale (Besar) risk class is higher, so it is not caught: PMA registration in Bali remains possible.

Who This Is For

A foreign engineering or construction firm that builds major hydropower infrastructure, typically targeting power plant projects outside Bali where the moratorium does not apply.

Licensing Overview
Risk LevelMenengah Tinggi
License TypeNIB + Sertifikat Standar
Foreign Ownership100% Open
Processing15 working days
2020 → 2025
Previous codes (KBLI 2020): 42914
🔨
Read Full Guide on Bali Zero↗

KBLI 2025 Construction: Building Development, Villa Projects & Prefab

kita.balizero.com
Common Questions
Can foreigners operate a hydropower reservoir construction business in Indonesia?
Yes. KBLI 42914 (Konstruksi Reservoir Pembangkit Listrik Tenaga Air) is TERBUKA — open to 100% foreign ownership via PT PMA. No local Indonesian partner required.
What license is required for KBLI 42914?
KBLI 42914 has a Menengah Tinggi risk classification. Required license: NIB + Sertifikat Standar. Processing time: 15.
What is KBLI 42914?
KBLI 42914 is the Indonesian business classification code for "Konstruksi Reservoir Pembangkit Listrik Tenaga Air" (Hydropower Reservoir Construction). It falls under Section F of KBLI 2025, the Indonesian Standard Industrial Classification updated by BPS (Regulation 7/2025). The June 2026 KBLI 2025 transition window has closed; operators should verify the code's current OSS/NIB treatment before relying on it for licensing, reporting, or amendments.
How did KBLI 42914 change from KBLI 2020 to 2025?
KBLI 42914 was mapped from previous code 42914 (KBLI 2020). This is a direct match — the code number and scope remained the same. The June 2026 KBLI 2025 transition window has closed. If an NIB still relies on legacy KBLI 2020 mappings, treat the migration as overdue and verify/remediate the OSS record before new license applications, amendments, LKPM, import approvals, or investor/worker sponsorship.

Related Codes

42915Section F

Coastal Protection Structure Construction

Konstruksi Bangunan Sipil Pelindung Pantai

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42913Section F

Fishery Port Construction

Konstruksi Bangunan Pelabuhan Perikanan

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42919Section F

Other Water Infrastructure Construction

Konstruksi Bangunan Sipil Prasarana Perairan dan Sejenis Lainnya

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42912Section F

Non-Fishery Port Construction

Konstruksi Bangunan Pelabuhan Bukan Perikanan

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42991Section F

Oil & Gas Civil Works Construction

Konstruksi Bangunan Sipil Minyak dan Gas Bumi

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42911Section F

Water Resource Infrastructure Construction

Konstruksi Bangunan Prasarana Sumber Daya Air

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
🏢

Ready to register this business?

Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 42914.

PT PMA Setup

IDR 20.000.000

Company registration, KBLI, NIB, domicile

Virtual Office

IDR 5.000.000

Legal address for your PT PMA in Bali

5,000+ companies registered since 2020

Get started on WhatsApp
5k+
Clients
★ 4.9
Reviews
~15 min
Response
Talk on WhatsApp
Zantara AIOSS Intelligence System
Context42914
Ask me anything about KBLI 42914 — Hydropower Reservoir Construction. Licensing, PMA rules, what changed in 2025, or how it works in Bali.